Mostrar el registro sencillo del ítem

dc.contributor.authorBohorquez Chacón, Lesley Fabiola
dc.contributor.authorROJAS PUENTES, MARIA DEL PILAR
dc.contributor.authorRomero, Sara María
dc.date.accessioned2021-10-29T18:04:17Z
dc.date.available2021-10-29T18:04:17Z
dc.date.issued2018-12-07
dc.identifier.urihttp://repositorio.ufps.edu.co/handle/ufps/483
dc.description.abstractA methodological proposal is designed for the planning of the scope, time and cost that strengthens the management of the projects developed by the services companies of Cúcuta and its metropolitan area. In the first phase, a descriptive study was carried out based on a maturity diagnosis which included the relevant tools to measure the culture in the planning of the scope, time and cost of the projects, which was validated by experts in PMI and applied in thirty companies to the officers who are in charge of the management of the projects. The second stage consisted in the selection of fifteen tools and techniques of the scope, time and cost management of the PMBOK Guide applicable in the methodological proposal according to the diagnosis. Finally, methodological guidelines for project management were designed in four social services companies, technology and computer science and civil constructions in which the tools defined in the proposal were incorporated, which will become guidelines for the execution of the projects guaranteeing the fulfilling of the deliverables, in the estimated time and with the assigned budget.eng
dc.format.extent07 páginasspa
dc.format.mimetypeapplication/pdfspa
dc.language.isoengspa
dc.publisherJournal of Physics: Conference Seriesspa
dc.relation.ispartofJournal of Physics: Conference Series
dc.rightsContent from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.eng
dc.sourcehttps://iopscience.iop.org/article/10.1088/1742-6596/1126/1/012058/metaspa
dc.titleApplication of project management tools in engineering services companies: Four case studieseng
dc.typeArtículo de revistaspa
dcterms.referencesProject Management Institute (PMI) 2017 A guide to the project management body of knowledge (PMBOK Guide) 6 (United States of America: Project Management Institute)spa
dcterms.referencesCeballos Parra Y C 2015 Evaluación de las etapas de planificación y construcción para diagnosticar las variables que afectan el cumplimiento de la programación, el presupuesto y los estándares de calidad de los proyectos de construcción (Bogotá: Universidad Militar Nueva Granada)spa
dcterms.referencesProject Management Institute (PMI) 2013 Standard for portfolio management 3 (United States of America: Project Management Institute)spa
dcterms.referencesProject Management Institute (PMI) 2013 Organizational project management maturity model (OPM3) 3 (United States of America: PMI publication)spa
dcterms.referencesKankhva V, Uvarova S and Belyaeva S 2016 Implementation of an innovative strategy in underground construction as a basis for the sustainable economic development of a construction company Procedia Engineering 165 1317-1322spa
dcterms.referencesKozlova O 2017 Performance assurance of the re-applying project documentation IOP Conf. Series: Earth and Environmental Science 90 012159spa
dcterms.referencesPawel S 2017 Risk management in construction projects Procedia Engineering 208 174-182spa
dcterms.referencesTitarenko B, Hasnaoui A and Titarenko R 2018 Risk management system model for construction projects IOP Conf. Series: Materials Science and Engineering 365 042019spa
dcterms.referencesHayes J P 1993 Making trade policy in the european community (Great Britain: Macmillian Press ltd) 122-133 chapter 9spa
dcterms.referencesSzafranko E 2017 Decision problmens in management of construction projects IOP Conf. Series: Materials Science and Engineering 251 012048spa
dcterms.referencesRomero S M 2014 Propuesta metodologica para la planificacion de proyectos informativos bajo el estandar PMI Revista Politecnica 10 57-70spa
dcterms.referencesMartínez G, Moreno B and Rubio M C 2012 Gestión del riesgo en proyectos de ingeniería. El caso del campus universitario PTS. Universidad de Granada (España) DYNA 79 7-14spa
dc.identifier.doihttps://doi.org/10.1088/1742-6596/1126/1/012058
dc.publisher.placeInglaterraspa
dc.relation.citationeditionVol.1126 No.1.(2018)spa
dc.relation.citationendpage6spa
dc.relation.citationissue1(2018)spa
dc.relation.citationstartpage1spa
dc.relation.citationvolume1126spa
dc.relation.citesRomero, S. M., Bohorquez, L. F., & Puentes, M. R. (2018, November). Application of project management tools in engineering services companies: Four case studies. In Journal of Physics: Conference Series (Vol. 1126, No. 1, p. 012058). IOP Publishing.
dc.relation.ispartofjournalJournal of Physics: Conference Seriesspa
dc.rights.accessrightsinfo:eu-repo/semantics/openAccessspa
dc.rights.creativecommonsAtribución 4.0 Internacional (CC BY 4.0)spa
dc.type.coarhttp://purl.org/coar/resource_type/c_6501spa
dc.type.contentTextspa
dc.type.driverinfo:eu-repo/semantics/articlespa
dc.type.redcolhttp://purl.org/redcol/resource_type/ARTspa
oaire.accessrightshttp://purl.org/coar/access_right/c_abf2spa
oaire.versionhttp://purl.org/coar/version/c_970fb48d4fbd8a85spa
dc.type.versioninfo:eu-repo/semantics/publishedVersionspa


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem