dc.contributor.author | Bohorquez Chacón, Lesley Fabiola | |
dc.contributor.author | ROJAS PUENTES, MARIA DEL PILAR | |
dc.contributor.author | Romero, Sara María | |
dc.date.accessioned | 2021-10-29T18:04:17Z | |
dc.date.available | 2021-10-29T18:04:17Z | |
dc.date.issued | 2018-12-07 | |
dc.identifier.uri | http://repositorio.ufps.edu.co/handle/ufps/483 | |
dc.description.abstract | A methodological proposal is designed for the planning of the scope, time and cost that strengthens the management of the projects developed by the services companies of Cúcuta and its metropolitan area. In the first phase, a descriptive study was carried out based on a maturity diagnosis which included the relevant tools to measure the culture in the planning of the scope, time and cost of the projects, which was validated by experts in PMI and applied in thirty companies to the officers who are in charge of the management of the projects. The second stage consisted in the selection of fifteen tools and techniques of the scope, time and cost management of the PMBOK Guide applicable in the methodological proposal according to the diagnosis. Finally, methodological guidelines for project management were designed in four social services companies, technology and computer science and civil constructions in which the tools defined in the proposal were incorporated, which will become guidelines for the execution of the projects guaranteeing the fulfilling of the deliverables, in the estimated time and with the assigned budget. | eng |
dc.format.extent | 07 páginas | spa |
dc.format.mimetype | application/pdf | spa |
dc.language.iso | eng | spa |
dc.publisher | Journal of Physics: Conference Series | spa |
dc.relation.ispartof | Journal of Physics: Conference Series | |
dc.rights | Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI. | eng |
dc.source | https://iopscience.iop.org/article/10.1088/1742-6596/1126/1/012058/meta | spa |
dc.title | Application of project management tools in engineering services companies: Four case studies | eng |
dc.type | Artículo de revista | spa |
dcterms.references | Project Management Institute (PMI) 2017 A guide to the project management body of knowledge (PMBOK Guide) 6 (United States of America: Project Management Institute) | spa |
dcterms.references | Ceballos Parra Y C 2015 Evaluación de las etapas de planificación y construcción para diagnosticar las variables que afectan el cumplimiento de la programación, el presupuesto y los estándares de calidad de los proyectos de construcción (Bogotá: Universidad Militar Nueva Granada) | spa |
dcterms.references | Project Management Institute (PMI) 2013 Standard for portfolio management 3 (United States of America: Project Management Institute) | spa |
dcterms.references | Project Management Institute (PMI) 2013 Organizational project management maturity model (OPM3) 3 (United States of America: PMI publication) | spa |
dcterms.references | Kankhva V, Uvarova S and Belyaeva S 2016 Implementation of an innovative strategy in underground construction as a basis for the sustainable economic development of a construction company Procedia Engineering 165 1317-1322 | spa |
dcterms.references | Kozlova O 2017 Performance assurance of the re-applying project documentation IOP Conf. Series: Earth and Environmental Science 90 012159 | spa |
dcterms.references | Pawel S 2017 Risk management in construction projects Procedia Engineering 208 174-182 | spa |
dcterms.references | Titarenko B, Hasnaoui A and Titarenko R 2018 Risk management system model for construction projects IOP Conf. Series: Materials Science and Engineering 365 042019 | spa |
dcterms.references | Hayes J P 1993 Making trade policy in the european community (Great Britain: Macmillian Press ltd) 122-133 chapter 9 | spa |
dcterms.references | Szafranko E 2017 Decision problmens in management of construction projects IOP Conf. Series: Materials Science and Engineering 251 012048 | spa |
dcterms.references | Romero S M 2014 Propuesta metodologica para la planificacion de proyectos informativos bajo el estandar PMI Revista Politecnica 10 57-70 | spa |
dcterms.references | Martínez G, Moreno B and Rubio M C 2012 Gestión del riesgo en proyectos de ingeniería. El caso del campus universitario PTS. Universidad de Granada (España) DYNA 79 7-14 | spa |
dc.identifier.doi | https://doi.org/10.1088/1742-6596/1126/1/012058 | |
dc.publisher.place | Inglaterra | spa |
dc.relation.citationedition | Vol.1126 No.1.(2018) | spa |
dc.relation.citationendpage | 6 | spa |
dc.relation.citationissue | 1(2018) | spa |
dc.relation.citationstartpage | 1 | spa |
dc.relation.citationvolume | 1126 | spa |
dc.relation.cites | Romero, S. M., Bohorquez, L. F., & Puentes, M. R. (2018, November). Application of project management tools in engineering services companies: Four case studies. In Journal of Physics: Conference Series (Vol. 1126, No. 1, p. 012058). IOP Publishing. | |
dc.relation.ispartofjournal | Journal of Physics: Conference Series | spa |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | spa |
dc.rights.creativecommons | Atribución 4.0 Internacional (CC BY 4.0) | spa |
dc.type.coar | http://purl.org/coar/resource_type/c_6501 | spa |
dc.type.content | Text | spa |
dc.type.driver | info:eu-repo/semantics/article | spa |
dc.type.redcol | http://purl.org/redcol/resource_type/ART | spa |
oaire.accessrights | http://purl.org/coar/access_right/c_abf2 | spa |
oaire.version | http://purl.org/coar/version/c_970fb48d4fbd8a85 | spa |
dc.type.version | info:eu-repo/semantics/publishedVersion | spa |