dc.contributor.author | Hurtado-Figueroa, Oswaldo | |
dc.contributor.author | Cárdenas-Gutiérrez, Javier Alfonso | |
dc.contributor.author | Rojas Suárez, Jhan Piero | |
dc.date.accessioned | 2021-11-23T16:19:29Z | |
dc.date.available | 2021-11-23T16:19:29Z | |
dc.date.issued | 2018-11-26 | |
dc.identifier.uri | http://repositorio.ufps.edu.co/handle/ufps/1284 | |
dc.description.abstract | The finishing work of construction represents an aggregated value that makes the
difference when a client is deciding to buy a house. The stipulated costs for
plastering and detail activities for houses, in occasions, surpasses 30% of the total
value of the construction work, considerable costs that require constant control
and supervision both in the analysis and the execution of the construction. The
implementation of the LEAN philosophy in this activity is not commonly
implemented due to the lack of knowledge of the tools that this method provides.
This research shows the implementation of line balancing, as a LEAN tool, in the
plastering and detailing activities for two-story masonry houses, constructed in the
housing project Callejas del Este which took place in the city of Cucuta,
Colombia. The implementation of this tool contemplated the analysis of execution
times of the work crew, the results were synthesized in tables for better
interpretation and conclusions of interest were developed for the improvement of
the observed processes and activities. | eng |
dc.format.extent | 08 páginas | spa |
dc.format.mimetype | application/pdf | spa |
dc.language.iso | eng | spa |
dc.publisher | Contemporary Engineering Sciences | spa |
dc.relation.ispartof | Contemporary Engineering Sciences | |
dc.rights | Copyright © 2018 Oswaldo Hurtado-Figueroa, Jhan P Rojas-Suarez and Javier A Cardenas-Gutierrez. This article is distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. | eng |
dc.source | http://www.m-hikari.com/ces/ces2018/ces97-100-2018/810544.html | spa |
dc.title | Application of LEAN tool "line balancing" to determine the productivity of workforce in activities of plastering and internal detailing in two-story houses made of masonry | eng |
dc.type | Artículo de revista | spa |
dcterms.references | L. F. Botero, Análisis de Rendimientos y consumos de mano de obra en actividades de construcción, Rev. Univ. EAFIT, (2002), 9–22. | spa |
dcterms.references | S. Popadiuk and C. W. Choo, Innovation and knowledge creation: How are these concepts related?, Int. J. Inf. Manage., 26 (2006), no. 4, 302–312. https://doi.org/10.1016/j.ijinfomgt.2006.03.011 | spa |
dcterms.references | A. M. Bashir, S. Suresh, D. Oloke, D. Proverbs and R. Gameson, Effect of Lean Construction tools on accident prevention in UK contracting organizations, J. Int. Real Estate Constr. Stud., 2 (2012), no. 1-2, 37–54. | spa |
dcterms.references | F. Fu, J. Sun and C. Pasquire, Carbon Emission Assessment for Steel Structure Based on Lean Construction Process, J. Intell. Robot. Syst., 79 (2015), 3–4, 401– 416. https://doi.org/10.1007/s10846-014-0106-x | spa |
dcterms.references | E. P. Small, K. Al Hamouri and H. Al Hamouri, Examination of Opportunities for Integration of Lean Principles in Construction in Dubai, Procedia Eng., 196 (2017), 616–621. https://doi.org/10.1016/j.proeng.2017.08.049 | spa |
dcterms.references | A. H. A. Jamil and M. S. Fathi, The Integration of Lean Construction and Sustainable Construction: A Stakeholder Perspective in Analyzing Sustainable Lean Construction Strategies in Malaysia, Procedia Comput. Sci., 100 (2016), 634–643. https://doi.org/10.1016/j.procs.2016.09.205 | spa |
dcterms.references | P. Erik Eriksson, Improving construction supply chain collaboration and performance: a lean construction pilot project, Supply Chain Manag. An Int. J., 15 (2010), no. 5, 394–403. https://doi.org/10.1108/13598541011068323 | spa |
dcterms.references | O. Abdelnaser and A. Abdulsalam, Barriers to prioritizing lean construction, Acta Teh. Corviniensis, (2015), no. 1998. | spa |
dcterms.references | L. Zhang and X. Chen, Role of Lean Tools in Supporting Knowledge Creation and Performance in Lean Construction, Procedia Eng., 145 (2016), 1267–1274. https://doi.org/10.1016/j.proeng.2016.04.163 | spa |
dcterms.references | O. Ogunbiyi, J. S. Goulding and A. Oladapo, An empirical study of the impact of lean construction techniques on sustainable construction in the UK, Constr. Innov., 14 (2014), no. 1, 88–107. https://doi.org/10.1108/ci-08-2012- 0045 | spa |
dcterms.references | L. Zhang and X. Chen, Role of Lean Tools in Supporting Knowledge Creation and Performance in Lean Construction, Procedia Eng., 145 (2016), 1267–1274. https://doi.org/10.1016/j.proeng.2016.04.163 | spa |
dcterms.references | O. Abdelnaser and A. Abdulsalam, Barriers to prioritizing lean construction, Acta Teh. Corviniensis, (2015), no. 1998. | spa |
dc.identifier.doi | https://doi.org/10.12988/ces.2018.810544 | |
dc.publisher.place | Bulgaria | spa |
dc.relation.citationedition | Vol.11 No.100.(2018) | spa |
dc.relation.citationendpage | 4964 | spa |
dc.relation.citationissue | 100(2018) | spa |
dc.relation.citationstartpage | 4957 | spa |
dc.relation.citationvolume | 11 | spa |
dc.relation.cites | Hurtado-Figueroa, O., Rojas-Suarez, J. P., & Cárdenas-Gutierrez, J. A. (2018). Application of LEAN Tool “Line Balancing” to Determine the Productivity of Workforce in Activities of Plastering and Internal Detailing in Two-Story Houses Made of Masonry. | |
dc.relation.ispartofjournal | Contemporary Engineering Sciences | spa |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | spa |
dc.rights.creativecommons | Atribución 4.0 Internacional (CC BY 4.0) | spa |
dc.subject.proposal | Lean Tools | eng |
dc.subject.proposal | Masonry | eng |
dc.subject.proposal | Productivity | eng |
dc.type.coar | http://purl.org/coar/resource_type/c_6501 | spa |
dc.type.content | Text | spa |
dc.type.driver | info:eu-repo/semantics/article | spa |
dc.type.redcol | http://purl.org/redcol/resource_type/ART | spa |
oaire.accessrights | http://purl.org/coar/access_right/c_abf2 | spa |
oaire.version | http://purl.org/coar/version/c_970fb48d4fbd8a85 | spa |
dc.type.version | info:eu-repo/semantics/publishedVersion | spa |