Mostrar el registro sencillo del ítem


Sequenciamento da produção num sistema flow shop utilizando algoritmos heurísticos e de otimização

dc.contributor.authorCaicedo-Rolón, Alvaro Jr
dc.contributor.authorParra LLanos, John Wilmer
dc.date.accessioned2021-11-07T00:08:53Z
dc.date.available2021-11-07T00:08:53Z
dc.date.issued2021-03-31
dc.identifier.urihttp://repositorio.ufps.edu.co/handle/ufps/720
dc.description.abstractThe purpose of the research was to determine the sequencing of the production of n jobs in m operations in a small footwear company in an environment of flow shop machine characteristics, which optimizes the total time of completion of the job in the production system (Makespan). We used heuristic algorithms that were applied through Lekin and WinQSB softwares, and for the optimization algorithm we designed a mathematical model that was solved by Juliabox software. Results show that the integer linear programming and local search minimize the makespan with 3807 minutes, and different production sequences for each algorithm, which consider permutation, which improves the traditional way of programming the production in 97 minutes, however, the optimization presents better results in the performance measures of average waiting time, average time of flow, and average job in process. Application of heuristic algorithms proves to be simple and fast, but the mathematical model of optimization designed and encoded in the software is a flexible and valuable tool for decision making in production programming, which could be applied in other footwear companies, and in other productive sectors whose companies have the same characteristics of the case study, reducing costs and improving delivery times.eng
dc.description.abstractO propósito da pesquisa foi determinar o sequenciamento da produção de n trabalhos em m operações em uma empresa de calçado de pequeno porte com características de um sistema de máquinas flow shop, que otimize o tempo total de conclusão dos trabalhos no sistema de produção (makespan). Se utilizaram algoritmos heurísticos que foram aplicados por meio dos softwares Lekin e WinQSB, e para o algoritmo de optimização se design um modelo matemático que foi resolvido pelo software Juliabox. Os resultados evidenciam que a programação linear inteira e local search minimizam o makespan com 3807 minutos, e sequências de produção diferente para cada algoritmo, que consideram a permutação, o que melhoram a maneira tradicional de programar a produção em 97 minutos, no entanto, a otimização tem melhores resultados em medidas de desempenho do tempo médio de espera, tempo médio de fluxo e trabalho médio em processo. Se destaca o simples e rápido da aplicação dos algoritmos heurísticos, mas o modelo matemático de optimização desenvolvido e codificado no software se constitui em uma ferramenta flexível e valiosa para a toma de decisões na programação da produção, que pode ser aplicado em outras empresas de calçado e outros sectores produtivos cujas empresas têm as mesmas características do estudo de caso, impactando na melhoria dos custos e prazos de entrega.por
dc.format.extent21 páginasspa
dc.format.mimetypeapplication/pdfspa
dc.language.isoengspa
dc.publisherGestão & Produçãospa
dc.relation.ispartofGestão & Produção
dc.rightsThis is an Open Access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.eng
dc.sourcehttps://www.scielo.br/j/gp/a/VYCXQBBfsR4z9r9zwtBNtzk/?lang=en#spa
dc.titleProduction sequencing in a flow shop system using optimization and heuristic algorithmseng
dc.titleSequenciamento da produção num sistema flow shop utilizando algoritmos heurísticos e de otimizaçãopor
dc.typeArtículo de revistaspa
dcterms.referencesAsociación Colombiana de Industriales del Calzado, el Cuero y sus Manufacturas – ACICAM. (2017). La industria del calzado y marroquinería cerro el 2016 en terreno positivo. Retrieved in 2017, February 15, from https://www.acicam.org/la-industria-del-calzado-y-marroquineria-cerro-el-2016-en-terreno-positivospa
dcterms.referencesBaker, K., & Trietsch, D. (2009). Principles of sequencing and scheduling New Jersey: John Wiley & Sons. http://dx.doi.org/10.1002/9780470451793spa
dcterms.referencesBallesteros, P., Ballesteros, D., & Bravo, J. (2013). Aplicación de una heurística constructiva en programación secuencial para asignación de varios trabajos a varias máquinas en paralelo. Sciences et Techniques, 18(1), 120-125. http://dx.doi.org/10.22517/23447214.8339spa
dcterms.referencesBezanson, J., Karpinski, S., Shah, V. B., & Edelman, A. (2012). Julia: a fast dynamic language for technical computing. arXiv, 1209.5145, 2-27.spa
dcterms.referencesBuzzo, W., & Moccellin, J. (2000). Programação da produção em sistemas flow shop utilizando um método heurístico híbrido algoritmo genético-simulated annealing. Gestão & Produção, 7(3), 364-377. http://dx.doi.org/10.1590/S0104-530X2000000300012spa
dcterms.referencesChang, Y. L. (2003). WinQSB version 2.0. for Windows 95, 98, ME and 2000. Decision Support Software for MS/OM. Hoboken: John Wiley & Sons.spa
dcterms.referencesChase, R. B., Jacobs, F. R., & Aquilano, N. J. (2009). Administración de operaciones: producción y cadena de suministros (12. ed.). México: McGraw-Hill.spa
dcterms.referencesCherkos, T. (2011). Performance analysis and improvement of Ethiopian leather footwear factories: with special reference to Anbessa Shoe S.C. (Master's thesis). Addis Ababa University, Addis Ababa.spa
dcterms.referencesColina, Y. B. (2011). Aplicaciones de programación lineal, entera y mixta. Ingeniería Industrial. Actualidad y Nuevas Tendencias., 2(7), 85-104. Retrieved in 2017, February 15, from http://servicio.bc.uc.edu.ve/ingenieria/revista/Inge-Industrial/volII-n7/art6.pdfspa
dcterms.referencesCosta, N. M., Varela, M. L., & Carmo-Silva, S. (2014). Scheduling in product oriented manufacturing systems. In 2014 Sixth World Congress on Nature and Biologically Inspired Computing (NaBIC) (pp. 196-201). Porto: IEEE. http://dx.doi.org/10.1109/NaBIC.2014.6921877spa
dcterms.referencesFeldman, A., & Pinedo, M. (2001). LEKIN versión 2.4. Flexible job-shop scheduling system New York.spa
dcterms.referencesFernández, C. (2011). Programación lineal e Ingeniería Industrial: una aproximación al estado del arte. Actualidad y Nuevas Tendencias, 2(6), 61-78. Retrieved in 2017, February 15, from http://servicio.bc.uc.edu.ve/ingenieria/revista/Inge-Industrial/VolII-n6/art4.pdfspa
dcterms.referencesFerreira, D., Morabito, R., & Rangel, S. (2008). Um modelo de otimização inteira mista e heurísticas relax and fix para a programação da produção de fábricas de refrigerantes de pequeno porte. Produção, 18(1), 76-88. http://dx.doi.org/10.1590/S0103-65132008000100006spa
dcterms.referencesGodinho, M., Fo., Faria, F., & Domingues, F. (2009). Pesquisa em Gestão da Produção na indústria de calçados: revisão, classificação e análise. Gestão & Produção, 16(2), 163-186. http://dx.doi.org/10.1590/S0104-530X2009000200002spa
dcterms.referencesGómez, J., Montenegro, O., Cardona, J., & Cabrera, J. (2008). Modelo de programación jerárquica de la producción en un Job shop flexible con interrupciones y tiempos de alistamiento dependientes de la secuencia. Revista Ingeniería e Investigación, 28(2), 72-79. Retrieved in 2017, February 15, from http://www.redalyc.org/pdf/643/64328211.pdfspa
dcterms.referencesGupta, J., & Stafford, E. Jr. (2006). Flowshop scheduling research after five decades. European Journal of Operational Research, 169(3), 699-711. http://dx.doi.org/10.1016/j.ejor.2005.02.001spa
dcterms.referencesHabib, A., Jilcha, K., & Berhan, E. (2015). Performance improvement by scheduling techniques: a case of Leather Industry Development Institute. In Afro-European Conference for Industrial Advancement (pp. 261-269). Addis Ababa: Springer International Publishing. http://dx.doi.org/10.1007/978-3-319-13572-4_21spa
dcterms.referencesHerrmann, J. (2007). The legacy of Taylor, Gantt, and Johnson: how to improve production scheduling. College Park: Institute for Systems Research, University of Maryland. Retrieved in 2017, February 27, from http://drum.lib.umd.edu/handle/1903/7488spa
dcterms.referencesJain, A., & Meeran, S. (1998). A state-of-the-art review of job-shop scheduling techniques (pp. 1-48, Technical report). Dundee: Department of Applied Physics, Electronic and Mechanical Engineering, University of Dundee. Retrieved in 2017, February 29, from http://ftp.bstu.by/ai/To-dom/My_research/Paper-0-again/For-courses/Job-SSP/jain.pdfspa
dcterms.referencesKrajewski, L. J., Ritzman, L. P., & Malhotra, M. K. (2008). Administración de operaciones procesos y cadenas de valor (8. ed.). México: Pearson Education.spa
dcterms.referencesLandmann, R., & Erdmann, R. (2011). Uma abordagem heurística para a programação da produção na indústria de fundição com utilização da lógica fuzzy. Gestão & Produção, 18(1), 119-130. http://dx.doi.org/10.1590/S0104-530X2011000100009spa
dcterms.referencesLópez, L. V., Sánchez, J. A., & Urrea, L. C. (2016). Prospectiva del sector de calzado de Cuero en Colombia, caso Calzado Yullyan (Trabajo de pregrado). Universidad del Rosario, Bogotá.spa
dcterms.referencesLuche, J., & Morabito, R. (2005). Otimização na programação da produção de grãos eletrofundidos: um estudo de caso. Gestão & Produção, 12(1), 135-149. http://dx.doi.org/10.1590/S0104-530X2005000100012spa
dcterms.referencesMéndez, G. A. (2011). Programacion de tareas: scheduling (1. ed.). Bogotá: Universidad Distrital Francisco José de Caldas.spa
dcterms.referencesMorais, M., & Moccellin, J. (2010). Métodos heurísticos construtivos para redução do estoque em processo em ambientes de produção flow shop híbridos com tempos de setup dependentes da sequência. Gestão & Produção, 17(2), 367-375. http://dx.doi.org/10.1590/S0104-530X2010000200011spa
dcterms.referencesPinedo, M. (2010). Scheduling, theory, algorithm and systems (4. ed.). New York: Springer.spa
dcterms.referencesRamírez, G., Torné, M., & Orejuela-Cabrera, J. (2012). Programación de operaciones para el llenado de tolvas dosificadoras en una empresa de concentrados. Revista Ingenierías Universidad de Medellín, 11(20), 165-178. Retrieved in 2017, February 27, from http://hdl.handle.net/11407/937spa
dcterms.referencesRestrepo, J. (2010). Aplicación de la heurística de palmer en la secuenciación de n tareas en m máquinas: un caso de estudio. Sciences et Techniques, 3(46), 175-178. http://dx.doi.org/10.22517/23447214.235spa
dcterms.referencesRestrepo, J. (2011). Aplicación de la heurística de Gupta en la secuenciación de n tareas en m máquinas: un caso de estudio. Sciences et Techniques, 3(49), 69-71. http://dx.doi.org/10.22517/23447214.1475spa
dcterms.referencesRestrepo, J., Bernal, M., & Sarmiento, G. (2012). Aplicación de la heurística de CDS en la secuenciación de tareas en máquinas: un caso de estudio. Sciences et Techniques, 2(52), 183-188. http://dx.doi.org/10.22517/23447214.7141spa
dcterms.referencesRestrepo, J., Medina, P., & Cruz, E. (2008). Programación de trabajos en una maquina utilizando un modelo de programación lineal entera. Sciences et Techniques, 3(40), 111-116. http://dx.doi.org/10.22517/23447214.3079spa
dcterms.referencesReza Hejazi, S., & Saghafian, S. (2005). Flowshop-scheduling problems with makespan criterion: a review. International Journal of Production Research, 43(14), 2895-2929. http://dx.doi.org/10.1080/0020754050056417spa
dcterms.referencesRojas, M. (2012). Utilización de heurísticas para programar Job Shops. In E. Said (Ed.), Diálogos y desafíos euro-latinoamericanos: ensayos sobre cooperación, derecho, educación y comunicación (pp. 328-346). Barranquilla: Editorial Universidad del Norte.spa
dcterms.referencesSepúlveda, J. P., & Berroeta, C. (2012). Reglas de decisión para la selección de sistemas de citas basadas en características del paciente y de la institución de salud. Revista Medica de Chile, 140(7), 867-872. http://dx.doi.org/10.4067/S0034-98872012000700006 PMid:23282698.spa
dcterms.referencesSipper, D., & Bulfin, R. (1998). Planeación y control de la producción (1. ed.). México: McGraw-Hill.spa
dcterms.referencesTaha, H. A. (2012). Investigación de operaciones (8. ed.). México: Pearson Education.spa
dcterms.referencesZhao, H., & Kong, F. (2016). Research and applications of shop scheduling based on genetic algorithms. Brazilian Archives of Biology and Technology, 59(spe), 1-7. http://dx.doi.org/10.1590/1678-4324-2016160545spa
dc.identifier.doihttps://doi.org/10.1590/1806-9649.2020v28e3886
dc.publisher.placeBrasilspa
dc.relation.citationeditionVol.28 No.1.(2021)spa
dc.relation.citationendpage21spa
dc.relation.citationissue1(2021)spa
dc.relation.citationstartpage1spa
dc.relation.citationvolume28spa
dc.relation.citesCaicedo-Rolón, Á., & Llanos, J. W. P. (2021). Production sequencing in a flow shop system using optimization and heuristic algorithms. Gestão & Produção, 28.
dc.relation.ispartofjournalGestão & Produçãospa
dc.rights.accessrightsinfo:eu-repo/semantics/openAccessspa
dc.rights.creativecommonsAtribución 4.0 Internacional (CC BY 4.0)spa
dc.subject.proposalFlow shopeng
dc.subject.proposalFlow shoppor
dc.subject.proposalHeuristicseng
dc.subject.proposalHeurísticapor
dc.subject.proposalOperations researcheng
dc.subject.proposalPesquisa operacionalpor
dc.subject.proposalOptimizationeng
dc.subject.proposalOtimizaçãopor
dc.subject.proposalInteger linear programmingeng
dc.subject.proposalProgramação linear inteirapor
dc.subject.proposalProduction sequencingeng
dc.subject.proposalSequenciamento da produçãopor
dc.type.coarhttp://purl.org/coar/resource_type/c_6501spa
dc.type.contentTextspa
dc.type.driverinfo:eu-repo/semantics/articlespa
dc.type.redcolhttp://purl.org/redcol/resource_type/ARTspa
oaire.accessrightshttp://purl.org/coar/access_right/c_abf2spa
oaire.versionhttp://purl.org/coar/version/c_970fb48d4fbd8a85spa
dc.type.versioninfo:eu-repo/semantics/publishedVersionspa


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem